Plumber

🏷️ Role Code: 2C3 β€’ πŸ›οΈ Department: Trades β€’ πŸ—οΈ Division: Construction


circle-info

🚿 Role Profile

πŸ’° EQTBLT
⏰ Commitment
🎯 Level Required
πŸ—³οΈ Voting Power

28-95/hr

Full-time

Apprentice (1B+)

1.05Γ—+

circle-info

🎯 Focus: Water & Waste Systems Installation

πŸ“ Location: Active Construction Sites

πŸ“œ License: State Plumbing License Required

Plumbers install and maintain water supply, drainage, and gas piping systems in Built By DAO properties. This essential role ensures residents have reliable, safe water and waste systems that meet health codes and sustainability standards.


πŸ’§ Water Systems

  • πŸ”§ Install supply piping (copper, PEX, CPVC)

  • πŸ”Œ Connect fixtures and appliances

  • πŸ”₯ Install water heaters

  • πŸ” Test for leaks and pressure

  • 🌿 Support water conservation measures

🚽 Drainage Systems

  • πŸ“¦ Install DWV (drain-waste-vent) piping

  • 🚿 Connect toilets, sinks, showers

  • πŸ•³οΈ Install floor drains and cleanouts

  • πŸ’¨ Ensure proper venting

  • βœ… Test drainage systems

πŸ”₯ Gas Piping (if licensed)

  • πŸ“¦ Install gas supply lines

  • πŸ”Œ Connect appliances

  • πŸ“ Pressure test systems

  • βœ… Support inspections

  • πŸ“œ Ensure code compliance

πŸ”§ Rough-In Work

  • πŸ“‹ Read plumbing plans

  • πŸ—ΊοΈ Layout fixture locations

  • πŸ•³οΈ Install underground plumbing

  • πŸ“¦ Run piping in walls/floors

  • 🀝 Coordinate with other trades


circle-exclamation

βœ… Requirements


πŸ› οΈ Tools & Equipment

Tool Type
Examples
Source

πŸ”§ Hand Tools

Wrenches, cutters, reamers

Personal kit

⚑ Power Tools

Threading machines, drills

The Depot

πŸ”¬ Specialty

Camera inspection, leak detection

The Depot

🦺 Safety

PPE, confined space equipment

Provided


πŸ“œ Code Knowledge Required

Code
Application

πŸ“œ UPC/IPC (Plumbing Code)

All plumbing work

πŸ“‹ Local amendments

Jurisdiction-specific

πŸ”₯ Fuel Gas Code

Gas piping

πŸ’§ Water efficiency

Conservation requirements

β™Ώ ADA

Accessible fixtures


πŸ“Š Performance Metrics

Metric
Target
Rating

⭐ Work quality

Pass inspection first time

⭐⭐⭐⭐⭐

πŸ’§ Leak rate

Zero leaks post-testing

⭐⭐⭐⭐⭐

🦺 Safety

Zero incidents

⭐⭐⭐⭐⭐

⏱️ Schedule

Meet milestone dates

β­β­β­β­β˜†

🀝 Coordination

Minimal trade conflicts

β­β­β­β­β˜†


chevron-right🦺 View Safety Requirementshashtag

Safety Requirements

Requirement
Details

πŸͺ– PPE

Hard hat, safety glasses, boots, gloves

πŸ”₯ Hot work

Proper precautions for soldering/brazing

πŸ•³οΈ Confined spaces

Permit required, proper procedures

πŸ“š Training

Current OSHA, plumbing safety

πŸ“’ Reporting

Report all hazards and incidents



chevron-rightπŸ—³οΈ View Governance Participationhashtag

As a Contributor+ rank member:

Activity
Access

πŸ—³οΈ Voting

Yes, with rank-based weight

πŸ“ Proposals

Can submit Operational proposals

πŸ›οΈ Committees

Technical and sustainability committees


🏭 Foundry Resources

Zone
Use

πŸ› οΈ The Depot

Tool checkout, equipment

πŸ”§ The Workshop

Training, practice

πŸ—οΈ The Yard

Materials storage


circle-check

πŸš€ How to Apply


Trades & On-Sitechevron-rightConstruction & Propertychevron-rightApprentice (Level 1B)chevron-rightThe Depotchevron-right

Last updated