Built By DAO operates on circular economy principles—keeping materials in use rather than sending them to landfills.
Salvage materials
Grade & repair
Use in projects
Continuous cycle
🎯 Purpose: Eliminate waste by designing materials to stay in productive use
🌍 Impact: 90% waste diversion, 50%+ salvaged materials in construction
Take → Make → Dispose
Recover → Process → Use → Recover
Resources depleted
Resources circulate
Waste created
Waste eliminated
Value extracted
Value maintained
🔧 Design out waste
Build for disassembly
📦 Keep materials in use
Salvage, repair, reuse
🌱 Regenerate systems
Restore rather than deplete
1️⃣
Prevent
Build less, design smaller
2️⃣
Reuse
Use salvaged materials
3️⃣
Repair
Fix rather than replace
4️⃣
Recycle
Process for new use
5️⃣
Recover
Energy recovery
6️⃣
Dispose
Last resort only
Building is permanent
Building is temporary
End of life = demolition
End of use = disassembly
Materials = waste
Materials = resources
1-2 days
1-2 weeks
95% to landfill
90%+ recovered
Materials destroyed
Materials preserved
No value capture
Significant value
🪵 Lumber
85%
Direct reuse, refinish
🧱 Brick
80%
Direct reuse
🔩 Hardware
95%
🚪 Doors
90%
Refurbish, reuse
🪟 Windows
Restore, reuse
⚡ Metals
98%
🧱 Concrete
Crush for aggregate
🔍 Survey
Assess all materials
🧹 Soft strip
Fixtures, finishes, trim
⚡ Systems
MEP removal
🏗️ Structure
Framing, masonry
🏠 Foundation
Concrete processing
⭐⭐⭐ A
Excellent
⭐⭐ B
Good
Minor repair
⭐ C
Fair
Processing needed
📦 Recycle
Damaged
Material recycling
🏗️ Yard
Receiving, sorting
📦 Depot
Storage, inventory
🔧 Workshop
Repair, preparation
🔥 Forge
Heavy fabrication
Sort by species, size
Remove fasteners
Clean surfaces
Grade quality
Mill to standard sizes
Stack and store
Remove mortar
Clean and sort
Grade by quality
Palletize
Store for reuse
Sort by type
Clean and test
Repair if needed
Catalog
Store in inventory
🪵 Remilling
Custom lumber sizes
🚪 Restoration
Historic door refinishing
🔩 Fabrication
Custom metal work
🎨 Refinishing
Wood finishing
DAO inventory
Partner salvage
Purchased salvage
New sustainable
New conventional
🏠 Framing
Salvaged dimensional lumber
Restored historic units
Refurbished solid wood
🏠 Flooring
Reclaimed hardwood
🧱 Exterior
Cleaned salvage brick
🔍 Search
Find materials by type
📊 Quantity
Available amounts
⭐ Quality
Grade information
📍 Location
Where stored
💰 Pricing
Internal rates
🏪 Retail
Public buyers
👷 Trade
Contractors
🏛️ Institutional
Organizations
🎨 Artisans
Makers, artists
📋 Source
Where material came from
📊 Properties
Technical specifications
⏱️ History
Previous use
♻️ Next life
Future potential
🏚️ Deconstruction
90%+ diversion
🏗️ Construction
80%+ diversion
🏢 Operations
75%+ diversion
🎯 Overall
Zero waste goal
🪵 Wood
Reuse or recycle
🧱 Masonry
⚡ Metal
Scrap recycling
📦 Cardboard
Recycling
🧪 Hazmat
Proper disposal
🗑️ Landfill
Minimize
📦 Recycling
Comprehensive program
🍎 Organics
Composting
🔧 E-waste
Certified recycling
🗑️ Trash
📊 Total generated
By weight
♻️ Diverted
By stream
🗑️ Landfilled
📈 Diversion rate
% diverted
🚫 Source reduction
Less packaging, bulk
♻️ Comprehensive recycling
All possible streams
🍎 Composting
Food and organics
🔄 Reuse programs
Internal sharing
♻️ Recovery rate
Track
📦 Reuse rate
50%
🔄 Circular rate
75%
💨 Carbon saved
vs. new materials
🗑️ Landfill avoided
Tons diverted
🌳 Trees saved
Lumber reuse
💧 Water saved
vs. production
💰 Material value
Salvage value
💵 Cost savings
vs. new purchase
👥 Jobs created
Processing work
🎓 Training value
Skills developed
👷 Workforce development
Members trained
🏪 Affordable materials
Community access
📚 Education
Tours, programs
🌍 Demonstration
Model for others
📊 Project reports
Per project
Stakeholders
📈 Quarterly metrics
Quarterly
All members
🌍 Annual impact
Annually
Public
Example Project: 1,500 sq ft Home Deconstruction
5,000 bd ft
2.5 tons CO2e
$3,000
2,000 units
1.2 tons CO2e
$1,000
8 units
0.2 tons CO2e
$800
12 units
0.5 tons CO2e
$1,200
500 lbs
0.8 tons CO2e
$200
Total
90% diverted
5.2 tons CO2e
$6,200
🏚️ Recover materials through deconstruction
🔧 Process and grade for reuse
📦 Use salvaged materials first
📊 Track and report impact
Last updated 15 days ago
Site Survey → Soft Strip → Systems → Structure → Foundation